موضوع: Blasting damage in rock

Threaded View

پست قبلی پست قبلی   پست بعدی پست بعدی
  1. #1
    کاربر جدید
    رشته تحصیلی
    استخراج
    نوشته ها
    11
    ارسال تشکر
    0
    دریافت تشکر: 33
    قدرت امتیاز دهی
    0
    Array

    پیش فرض Blasting damage in rock


    Blasting damage in rock
    Introduction
    The development of rock mechanics as a practical engineering tool in both
    underground and surface mining has followed a rather erratic path. Only the most
    naively optimistic amongst us would claim that the end of the road has been reached
    and that the subject has matured into a fully developed applied science. On the other
    hand, there have been some real advances which only the most cynical would
    discount.
    One of the results of the erratic evolutionary path has been the emergence of different
    rates of advance of different branches of the subject of rock mechanics. Leading the
    field are subjects such as the mechanics of slope instability, the monitoring of
    movement in surface and underground excavations and the analysis of induced
    stresses around underground excavations. Trailing the field are subjects such as the
    rational design of tunnel support, the movement of groundwater through jointed rock
    masses and the measurement of in situ stresses. Bringing up the rear are those areas of
    application where rock mechanics has to interact with other disciplines and one of
    these areas involves the influence of blasting upon the stability of rock excavations.
    Historical perspective
    By far the most common technique of rock excavation is that of drilling and blasting.
    From the earliest days of blasting with black powder, there have been steady
    developments in explosives, detonating and delaying techniques and in our
    understanding of the mechanics of rock breakage by explosives.
    It is not the development in blasting technology that is of interest in this discussion. It
    is the application of this technology to the creation of excavations in rock and the
    influence of the excavation techniques upon the stability of the remaining rock.
    As is frequently the case in engineering, subjects that develop as separate disciplines
    tend to develop in isolation. Hence, a handful of highly skilled and dedicated
    researchers, frequently working in association with explosives manufacturers, have
    developed techniques for producing optimum fragmentation and minimising damage
    in blasts. At the other end of the spectrum are miners who have learned their blasting
    skills by traditional apprenticeship methods, and who are either not familiar with the
    specialist blasting control techniques or are not convinced that the results obtained
    from the use of these techniques justify the effort and expense. At fault in this system
    are owners and managers who are more concerned with cost than with safety and
    design or planning engineers who see both sides but are not prepared to get involved
    because they view blasting as a black art with the added threat of severe legal
    penalties for errors.
    Blast damage in rock
    2
    The need to change the present system is not widely recognised because the impact of
    blasting damage upon the stability of structures in rock is not widely recognised or
    understood. It is the author's aim, in the remainder of this chapter, to explore this
    subject and to identify the causes of blast damage and to suggest possible
    improvements in the system.
    A discussion on the influence of excavation processes upon the stability of rock
    structures would not be complete without a discussion on machine excavation. The
    ultimate in excavation techniques, which leave the rock as undisturbed as possible, is
    the full-face tunnelling machine. Partial face machines or roadheaders, when used
    correctly, will also inflict very little damage on the rock. The characteristics of
    tunnelling machines will not be discussed here but comparisons will be drawn
    between the amount of damage caused by these machines and by blasting.
    Blasting damage
    It appears to me, a casual reader of theoretical papers on blasting, that the precise
    nature of the mechanism of rock fragmentation as a result of detonation of an
    explosive charge is not fully understood. However, from a practical point of view, it
    seems reasonable to accept that both the dynamic stresses induced by the detonation
    and the expanding gases produced by the explosion play important roles in the
    fragmentation process.
    Duvall and Fogelson (1962), Langefors and Khilstrom (1973) and others, have
    published blast damage criteria for buildings and other surface structures. Almost all
    of these criteria relate blast damage to peak particle velocity resulting from the
    dynamic stresses induced by the explosion. While it is generally recognised that gas
    pressure assists in the rock fragmentation process, there has been little attempt to
    quantify this damage.
    Work on the strength of jointed rock masses suggests that this strength is influenced
    by the degree of interlocking between individual rock blocks separated by
    discontinuities such as bedding planes and joints. For all practical purposes, the
    tensile strength of these discontinuities can be taken as zero, and a small amount of
    opening or shear displacement will result in a dramatic drop in the interlocking of the
    individual blocks. It is easy to visualise how the high pressure gases expanding
    outwards from an explosion will jet into these discontinuities and cause a breakdown
    of this important block interlocking. Obviously, the amount of damage or strength
    reduction will vary with distance from the explosive charge, and also with the in situ
    stresses which have to be overcome by the high pressure gases before loosening of
    the rock can take place. Consequently, the extent of the gas pressure induced damage
    can be expected to decrease with depth below surface, and surface structures such as
    slopes will be very susceptible to gas pressure induced blast damage.
    An additional cause of blast damage is that of fracturing induced by release of load
    (Hagan, 1982). This mechanism is best explained by the analogy of dropping a heavy
    steel plate onto a pile of rubber mats. These rubber mats are compressed until the
    Blast damage in rock
    3
    momentum of the falling steel plate has been exhausted. The highly compressed
    rubber mats then accelerate the plate in the opposite direction and, in ejecting it
    vertically upwards, separate from each other. Such separation between adjacent layers
    explains the `tension fractures' frequently observed in open pit and strip mine
    operations where poor blasting practices encourage pit wall instability. McIntyre and
    Hagan (1976) report vertical cracks parallel to and up to 55 m behind newly created
    open pit mine faces where large multi-row blasts have been used.
    Whether or not one agrees with the postulated mechanism of release of load
    fracturing, the fact that cracks can be induced at very considerable distance from the
    point of detonation of an explosive must be a cause for serious concern. Obviously,
    these fractures, whatever their cause, will have a major disruptive effect upon the
    integrity of the rock mass and this, in turn, will cause a reduction in overall stability.
    Hoek (1975) has argued that blasting will not induce deep seated instability in large
    open pit mine slopes. This is because the failure surface can be several hundred
    metres below the surface in a very large slope, and also because this failure surface
    will generally not be aligned in the same direction as blast induced fractures. Hence,
    unless a slope is already very close to the point of failure, and the blast is simply the
    last straw that breaks the camel's back, blasting will not generally induce major deepseated
    instability.
    On the other hand, near surface damage to the rock mass can seriously reduce the
    stability of the individual benches which make up the slope and which carry the haul
    roads. Consequently, in a badly blasted slope, the overall slope may be reasonably
    stable, but the face may resemble a rubble pile.
    In a tunnel or other large underground excavation, the problem is rather different. The
    stability of the underground structure is very much dependent upon the integrity of
    the rock immediately surrounding the excavation. In particular, the tendency for roof
    falls is directly related to the interlocking of the immediate roof strata. Since blast
    damage can easily extend several metres into the rock which has been poorly blasted,
    the halo of loosened rock can give rise to serious instability problems in the rock
    surrounding the underground openings.
    Damage control
    The ultimate in damage control is machine excavation. Anyone who has visited an
    underground metal mine and looked up a bored raise will have been impressed by the
    lack of disturbance to the rock and the stability of the excavation. Even when the
    stresses in the rock surrounding the raise are high enough to induce fracturing in the
    walls, the damage is usually limited to less than half a metre in depth, and the overall
    stability of the raise is seldom jeopardised.
    Full-face and roadheader type tunnelling machines are becoming more and more
    common, particularly for civil engineering tunnelling. These machines have been
    developed to the point where advance rates and overall costs are generally
    Blast damage in rock
    4
    comparable or better than the best drill and blast excavation methods. The lack of
    disturbance to the rock and the decrease in the amount of support required are major
    advantages in the use of tunnelling machines.
    For surface excavations, there are a few cases in which machine excavation can be
    used to great advantage. In the Bougainville open pit copper mine in Papua New
    Guinea, trials were carried out on dozer cutting of the final pit wall faces. The final
    blastholes were placed about 19 m from the ultimate bench crest position. The
    remaining rock was then ripped using a D-10 dozer, and the final 55 degree face was
    trimmed with the dozer blade. The rock is a very heavily jointed andesite, and the
    results of the dozer cutting were remarkable when compared with the bench faces
    created by the normal open pit blasting techniques.
    The machine excavation techniques described above are not widely applicable in
    underground mining situations, and consideration must therefore be given to what can
    be done about controlling damage in normal drill and blast operations.
    A common misconception is that the only step required to control blasting damage is
    to introduce pre-splitting or smooth blasting techniques. These blasting methods,
    which involve the simultaneous detonation of a row of closely spaced, lightly charged
    holes, are designed to create a clean separation surface between the rock to be blasted
    and the rock which is to remain. When correctly performed, these blasts can produce
    very clean faces with a minimum of overbreak and disturbance. However, controlling
    blasting damage starts long before the introduction of pre-splitting or smooth blasting.
    As pointed out earlier, a poorly designed blast can induce cracks several metres
    behind the last row of blastholes. Clearly, if such damage has already been inflicted
    on the rock, it is far too late to attempt to remedy the situation by using smooth
    blasting to trim the last few metres of excavation. On the other hand, if the entire
    blast has been correctly designed and executed, smooth blasting can be very
    beneficial in trimming the final excavation face.
    Figure 1 illustrates a comparison between the results achieved by a normal blast and a
    face created by presplit blasting in jointed gneiss. It is evident that, in spite of the
    fairly large geological structures visible in the face, a good clean face has been
    achieved by the pre-split. It is also not difficult to imagine that the pre-split face is
    more stable than the section which has been blasted without special attention to the
    final wall condition.
    The correct design of a blast starts with the very first hole to be detonated. In the case
    of a tunnel blast, the first requirement is to create a void into which rock broken by
    the blast can expand. This is generally achieved by a wedge or burn cut which is
    designed to create a clean void and to eject the rock originally contained in this void
    clear of the tunnel face.
    Blast damage in rock
    5
    Figure 1: Comparison between the results achieved by pre-split blasting (on the
    left) and normal bulk blasting for a surface excavation in gneiss.
    In today's drill and blast tunnelling in which multi-boom drilling machines are used,
    the most convenient method for creating the initial void is the burn cut. This involves
    drilling a pattern of carefully spaced parallel holes which are then charged with
    powerful explosive and detonated sequentially using millisecond delays. A detailed
    discussion on the design of burn cuts is given by Hagan (1980).
    Once a void has been created for the full length of the intended blast depth or `pull',
    the next step is to break the rock progressively into this void. This is generally
    achieved by sequentially detonating carefully spaced parallel holes, using one-half
    second delays. The purpose of using such long delays is to ensure that the rock
    broken by each successive blasthole has sufficient time to detach from the
    surrounding rock and to be ejected into the tunnel, leaving the necessary void into
    which the next blast will break.
    A final step is to use a smooth blast in which lightly charged perimeter holes are
    detonated simultaneously in order to peel off the remaining half to one metre of rock,
    leaving a clean excavation surface.
    The details of such a tunnel blast are given in Figure 2. The development of the burn
    cut is illustrated in Figure 3 and the sequence of detonation and fracture of the
    remainder of the blast is shown in Figure 4. The results achieved are illustrated in a
    photograph reproduced in Figure 5. In this particular project, a significant reduction
    in the amount of support installed in the tunnel was achieved as a result of the
    implementation of the blasting design shown in Figure 2.
    Blast damage in rock
    6
    Holes no Dia
    mm
    Explosives Total
    wt.
    kg
    Detonat
    ors
    Burn 14 45 Gelamex 80, 18 sticks/hole 57 Millisec
    Lifters 9 45 Gelamex 80, 16 sticks/hole 33 Half-sec
    Perimeter 26 45 Gurit, 7 sticks/hole and 26 Half-sec
    Gelamex 80, 1 stick/hole
    Others 44 45 Gelamex 80, 13 sticks/hole 130 Half-sec
    Relief 3 75 No charge
    Total 96 246
    Figure 2: Blasthole pattern and charge details used by Balfour Beatty - Nuttall on the Victoria
    hydroelectric project in Sri Lanka. Roman numerals refer to the detonation sequence of
    millisecond delays in the burn cut, while Arabic numerals refer to the half-second delays in
    the remainder of the blast.
    Blast damage in rock
    7
    Figure 3 Development of a burn cut using millisecond delays.
    Blast damage in rock
    8
    Figure 4: Use of half-second delays in the main blast and smooth blasting of
    the perimeter of a tunnel.
    Blast damage in rock
    9
    Figure 5: Results achieved using well designed and carefully controlled blasting in a 19 foot
    diameter tunnel in gneiss in the Victoria hydroelectric project in Sri Lanka. Note that no
    support is required in this tunnel as a result of the minimal damage inflicted on the rock.
    Photograph reproduced with permission from the British Overseas Development
    Administration and from Balfour Beatty - Nuttall.
    A final point on blasting in underground excavations is that it is seldom practical to
    use pre-split blasting, except in the case of a benching operation. In a pre-split blast,
    the closely spaced parallel holes (similar to those numbered 9, 10 and 11 in Figure 2)
    are detonated before the main blast instead of after, as in the case of a smooth blast.
    Since a pre-split blast carried out under these circumstances has to take place in
    almost completely undisturbed rock which may also be subjected to relatively high
    induced stresses, the chances of creating a clean break line are not very good. The
    cracks, which should run cleanly from one hole to the next, will frequently veer off in
    the direction of some pre-existing weakness such as foliation. For these reasons,
    smooth blasting is preferred to pre-split blasting for tunnelling operations.
    In the case of rock slopes such as those in open pit mines, the tendency today is to use
    large diameter blastholes on a relatively large spacing. These holes are generally
    detonated using millisecond delays which are designed to give row by row blasting.
    Unfortunately, scatter in the delay times of the most commonly used open pit blasting
    systems can sometimes cause the blastholes to fire out of sequence, and this can
    Blast damage in rock
    10
    produce poor fragmentation as well as severe damage to the rock which is to remain
    to form stable slopes.
    Downhole delay systems which can reduce the problems associated with the
    detonation of charges in large diameter blastholes are available, but open pit blasting
    engineers are reluctant to use them because of the added complications of laying out
    the blasting pattern, and also because of a fear of cut-offs due to failure of the ground
    caused by the earlier firing blastholes. There is clearly a need for further development
    of the technology and the practical application of bench blasting detonation delaying,
    particularly for the large blasts which are required in open pit mining operations.
    Blasting design and control
    While there is room for improvement in the actual techniques used in blasting, many
    of the existing techniques, if correctly applied, could be used to reduce blasting
    damage in both surface and underground rock excavation. As pointed out earlier, poor
    communications and reluctance to become involved on the part of most engineers,
    means that good blasting practices are generally not used on mining and civil
    engineering projects.
    What can be done to improve the situation? In the writer's opinion, the most critical
    need is for a major improvement in communications. Currently available, written
    information on control of blasting damage is either grossly inadequate, as in the case
    of blasting handbooks published by explosives manufacturers, or it is hidden in
    technical journals or texts which are not read by practical blasting engineers. Ideally,
    what is required is a clear, concise book, which sets out the principles of blasting
    design and control in unambiguous, non- mathematical language. Failing this, a series
    of articles, in similarly plain language, published in trade journals, would help a great
    deal.
    In addition to the gradual improvement in the understanding of the causes and control
    of blast damage which will be achieved by the improvement in communications,
    there is also a need for more urgent action on the part of engineers involved in rock
    excavation projects. Such engineers, who should at least be aware of the damage
    being inflicted by poor blasting, should take a much stronger line with owners,
    managers, contractors and blasting foremen. While these engineers may not feel
    themselves to be competent to redesign the blasts, they may be able to persuade the
    other parties to seek the advice of a blasting specialist. Explosives manufacturers can
    usually supply such specialist services, or can recommend individuals who will assist
    in improving the blast design. Incidentally, in addition to reducing the blasting
    damage, a well designed blast is generally more efficient and may provide improved
    fragmentation and better muck-pile conditions at the same cost.
    Conclusion
    Needless damage is being caused to both tunnels and surface excavation by poor
    blasting. This damage results in a decrease in stability which, in turn, adds to the costs
    Blast damage in rock
    11
    of a project by the requirement of greater volumes of excavation or increased rock
    support.
    Tools and techniques are available to minimise this damage, but these are not being
    applied very widely in either the mining or civil engineering industries because of a
    lack of awareness of the benefits to be gained, and a fear of the costs involved in
    applying controlled blasting techniques. There is an urgent need for improved
    communications between the blasting specialists who are competent to design
    optimum blasting systems and the owners, managers and blasting foremen who are
    responsible for the execution of these designs.
    Research organisations involved in work on blasting should also recognise the current
    lack of effective communications and, in addition to their work in improving blasting
    techniques, they should be more willing to participate in field-oriented programs in
    co-operation with industry. Not only will organisations gain invaluable practical
    knowledge but, by working side-by-side with other engineers, they will do a great
    deal to improve the general awareness of what can be achieved by good blasting
    practices.
    References
    Duvall, W.I. and Fogelson, D.E. 1962. Review of criteria for estimating damage to
    residences from blasting vibrations . U.S. Bur. Mines Rep. Invest. 5986. 19
    pages.
    Hagan, T.N. 1980. Understanding the burn cut - a key to greater advance rates.
    Trans. Instn. Min. Metall. (Sect. A: Min. Industry) , 89, A30-36.
    Hagan, T.N. 1982. Controlling blast-induced cracking around large caverns. Proc.
    ISRM symp., rock mechanics related to caverns and pressure shafts, Aachen,
    West Germany.
    Hoek, E. 1975. Influence of drilling and blasting on the stability of slopes in open pit
    mines and quarries. Proc. Atlas Copco Bench Drilling Days symp.,
    Stockholm, Sweden.
    Langefors, U. and Khilstrom, B. 1973. The modern technique of rock blasting. 2nd
    edn. New York: Wiley. 405 pages
    McIntyre, J.S. and Hagan, T.N. 1976. The design of overburden blasts to promote
    highwall stability at a large strip mine. Proc. 11th Canadian rock mech.
    symp. , Vancouver.

  2. 2 کاربر از پست مفید ابوالحسنی محمد سپاس کرده اند .


اطلاعات موضوع

کاربرانی که در حال مشاهده این موضوع هستند

در حال حاضر 1 کاربر در حال مشاهده این موضوع است. (0 کاربران و 1 مهمان ها)

موضوعات مشابه

  1. Blasting Operations
    توسط ابوالحسنی محمد در انجمن استخراج معدن
    پاسخ ها: 0
    آخرين نوشته: 27th December 2011, 12:34 AM
  2. حضور یاس در فیلم مستند Rock On
    توسط LaDy Ds DeMoNa در انجمن آرشیو بخش هنر
    پاسخ ها: 0
    آخرين نوشته: 8th April 2010, 10:05 PM
  3. Damage | 2009 | DVDRip | MKV 350 MB
    توسط LaDy Ds DeMoNa در انجمن فیلم های اکشن
    پاسخ ها: 2
    آخرين نوشته: 17th March 2010, 08:17 PM
  4. تعريف سنگ نرم ( Soft Rock )
    توسط ریپورتر در انجمن سایر موضوعات مهندسی معدن
    پاسخ ها: 0
    آخرين نوشته: 16th November 2009, 08:57 PM

کلمات کلیدی این موضوع

مجوز های ارسال و ویرایش

  • شما نمیتوانید موضوع جدیدی ارسال کنید
  • شما امکان ارسال پاسخ را ندارید
  • شما نمیتوانید فایل پیوست کنید.
  • شما نمیتوانید پست های خود را ویرایش کنید
  •